ePrivacy and GPDR Cookie Consent by TermsFeed Generator

What is the maximum period for submitting the PSUR after the DLP?

In the case of the PSUR stretching over the time period of within 12 months inclusive, the PSUR must be submitted within 70 calendar days from the DLP.

In the case of the PSUR stretching over the time period exceeding 12 months, the PSUR must be submitted within 90 calendar days from the DLP.

If the Institute requests the PSUR ad hoc, the maximum period for the submission shall be 90 days from the DLP.